Roly Poly Sewing Mouse (JG00048-8)
Roly Poly Sewing Mouse
This cute little linework mouse is one of the designs from the Roly Poly Sewing Mice – full set.
Size: 3.7″x3.6″ (95x92mm) 4″x4″ hoop.
Stitches: 2484
The following formats are supplied with purchase:
PES, PEC, HUS, VP3, VIP, DST, SEW, JEF, JEF+, XXX, EXP
If you do not see the machine format that you need please contact us.
Available for immediate download after purchase.
A Few Notes:
- This is a digital file for a linework machine embroidery design not an iron on patch. You will need an embroidery machine to stitch it out.
- Delivery is by instant download and your design is available immediately after purchase.
- All our applique and machine embroidery designs are all manually digitized and test sewn before release.
- Resizing is not recommended as it may alter your stitch out. If you need another size please contact us.